|
|
| l |
|
Installations
|
| l |
| |
|
1.
|
Container
Terminal |
Located on the Guixar Wharf, it provides 750 metres of docking facilities
with a depth of 17 metres and 130,000m2 for the unloading of containers.
The East Transversal Wharf also has 250 metres
of docking facilities with a depth of 9 metres and a surface area of
approximately 4,530m2 on which to deposit containers.
|
| |
|
2.
|
Terminal
Ro - Ro |
|
The port of Vigo installations include four ramps
for Ro-Ro traffic. Two are located on the Bouzas Wharf, one on the Transversal/Trade
Wharf, and one on the La Laxe Dock (this last is mobile).
|
| |
|
3.
|
Fish
Terminal |
|
New Deep-Sea Fish Market (35,000m2
surface area). Deep-Sea and Coastal Fish Market: A building of 16.164
m2 joined to the New Deep-Sea Fish Market by two footbridges.
|
| |
|
4.
|
Fruit
Terminal |
|
Located on the Transversal/Trade Wharf,
it is 250 metres long and 100 metres wide with a depth of 8.5 metres.
|
| |
|
5.
|
Other
Terminals |
| |
|
|
5.1.
|
Passengers |
|
|
|
Located on the Ocean Liner Quay, it includes
a Maritime Station and offers all the necessary services for passenger transport. |
|
|
5.2.
|
Multipurpose |
|
|
|
Vigo Port has 1,434 metres of docking facilities
with a depth of over 8 metres for general cargos. |
|
|
5.3.
|
Naval
Construction and Repairs |
| |
|
There are 16 shipyards and
numerous marine repair shops in the port service area. |
| |
| l |